IBEW Local 131 Job Information Page (2024)

Book 1: 22

Book 2: 16

Click Here for Book 1 and Book 2 Referral and Resign Information

BOOK 2 SIGNS ARE TO BE DONE BY EMAIL/FAX FROM HOME LOCAL or IN PERSON

TO BID ON A NEW CALL:

You must leave a message on the Job Line between 5:00 P.M. and 8:00 A.M.

Anyone ineligible for a call due to vaccine status or background check must call the jobline each call to prevent a strike/ding

(269) 382-1762

TO ACCEPT AN OPEN CALL:

Please call the Hall during normal business hours.

(8:00 A.M. to 4:30 P.M.)


New CallOpen Call Closed Call

Click herefor Michigan State Licensing Information

ClickhereJIW WageBreakdown

Martell Electric-

(1 JIW - 1 CE) Service - Various Locations; Indefinite

Req. Date: 6/21/24; Start Date: 6/24/24

MUST Drug Test Required

Moore Electrical-

(2 JIW); Zoetis B248, Req 6/20

(5x10's, 8's Sat)6am - 4:30pm Mon - Fri; 6am - 2:30pm on Saturday; Indefinite, Start ASAP

MI JIW License, MUST drug test within 60 days, Background Check

KEI Electric

(4) JIW,Graphic Packaging Inc(Kalamazoo)

Req Date 6/18, Start 6/19 through September, 7:00AM-3:30PM, M-F, possible OT

SS Card, ID Required

Nitro Electric - (2) Book 2

(2 of 5 JIW Filled), Vicksburg High School

Req Date 6/11; Start 6/13 @ 7:00AM - 3:30PM

2 forms of ID for on-boarding

Hi-TechElectric- Day book x 3 - Updated 6/6/24, increased to 3 CE's

(2 JIW Filled & 1 of 3 CE Filled), Various Locations

Req. Date: 3/26; Start Date: 3/28; 7:00AM - 3:30PM M-F; Indefinite

Background Check; MUST Drug Test; MI State JIW License

Hi-Tech Electric -

(0 of 3 JIW Filled) (0 of 1 CE Filled); Vicksburg Middle School; 7am - 3:30pm M-F; 2-3 Month Call

Req. Date: 6/3; Start Date: 6/10 - 8:00am @ Shop

MI JIW License, MUST Drug Test, Background Check

KEI ECM

(0 of 4 JIW Filled); Various Locations; 40 hours with occasional OT; Indefinite Call

Req. Date: 5/28/24; Start Date: ASAP

Champion Specialty Services-

(Posted5/20/24)(3 of 4 JIW filled), Palisades Nuclear Facility (Working under Local 131 contract)

Report: two weeks after bidding, 6:30AM to 5:00PM, M-T 10 hours, Friday OT when necessary

Background check up to 2 weeks before start

Contractor Drug Testing, Background Check, NMAP

Hi-Tech Electric

(1 JIW) **Updated 6/3/2024

South Haven Water Treatment Plant & Various Locations; 7am-3:30pm

Req. Date: 5/15/24; Start Date: 5/20/24; Duration: Through Summer 2025

Required: MI JIW License & MUST Drug Test

Hi-TechElectric- (3) Book 2, (1) Book I, Daybook

(5 of8 JIW Filled,increased April 3rd), Pfizer

Start Date: 1/24/2024; 7:00AM - 3:30PM; Indefinite

Background Check; MUST Drug Test

Hi-Tech Electric

(1 JIW filled); Kalamazoo College; 7am - 3:30pm M-F; Indefinite

Req. Date: 6/3; Start Date: 6/5 - 8:00am @ Shop

MI JIW License & MUST Drug Test

Moore Electrical - Contractor Canceled Call 6/19/24

(2 of 4 JIW Filled); Gun Lake Casino; 6am - 2:30pm M-F; Indefinite

Req. Date: 6/4; Start Date: 6/10 @ 6am

Requirements: MI JIW License, Background Check, Current MUST Drug Test

Moore Electric-(1)Daybook & Contractor canceled remaining call 6/17/24

Cancelled (3 JIW, 1 FRMN 12.5%) Pfizer

Req. Date6/10; Start 6/12, 7:00am to 3:30pm, possible OT

Background check, MI JIW License, MUST Drug Test, 2 forms of ID

Fuller Electric

(1 of 1 JIW Filled); Various Locations; 7am - 3:30pm M-F; Indefinite

Req. Date: 6/4; Start Date: 6/17 @ 8am

Requirements: MI Master's License, MI JIW License, Welder, Experience in Generators, Residential, and Service

Hi-Tech Electric- Contractor Closed Call 6/17/24

(1 JIW), American Axle Manufacturing, Three Rivers

Shift: 6AM to 230PM

Req. 5/31/2024, Start 6/03/24, Indefinite

Mi State License Required, current MUST Drug Test

Moore Electrical- This call has been updated 4/24**

(4 of 4 JIW Filled,increased April 24th); Zoetis B248 - Various

(5x10's, 8's Sat)6am - 4:30pm Mon - Fri; 6am - 2:30pm on Saturday; Indefinite, Start ASAP

MI JIW License, MUST drug test within 60 days, Background Check

Martell Electric- (1) Book 2

(1 of 2 JIW Filled)Woods Lake - Lighting Project

Start Date: 5/28/2024; 6:00am - 2:30pm M-F; Short Call

MUST Drug Test Required

Linear Electric - Book 2

(1 JIW) Paw Paw Schools; 7am - 3:30pm M-F; 4 Month Call

Req. Date 6/5; Start Date: 6/10; Report to Jobsite

Required: MI JIW License & Background Check

Linear Electric - #6

(1 JIW); Paw Paw School; 7am - 3:30 M-F; 7 Month Call

Req. Date: 6/4; Start Date: 6/7; Report to Jobsite

Hi-Tech Electric- Contractor Canceled Call 6/5/24

(1 JIW); Meijer Remodel; Three Rivers

Shift: 7AM to 330PM

Req. Date: 5/31/2024; Start Date: 6/03/2024; Duration:9-10 Months

Required: MI State JIW License and current drug test

KEIElectric-#7 & Daybook

(2 JIW)- Multiple Locations

40 hour indefinite call, 7AM Start

Req. Date: 5/13/24

Nitro Electric - Daybook

(2 JIW) Consumers Block Plant - Kalamazoo

7am-3:30pm M - F; Indefinite

Req. Date: 4/29/24

Hi-Tech Electric- Daybook

(1 JIW); Meijer Remodel; Three Rivers

Req. Date: 5/13/2024; Start Date: 5/14/2024; Duration: 10 Months

Required: MI State JIW License and current drug test

IBID Co. Electric:Bk1 #1 & 2

(2 JIW); Welch's - Paw Paw

Req. Date: 5/1; Start Date: 5/6; 6am Start; 5x10's, then 6x10's; 8 Months Duration

MI JIW License, Safety Glasses & Steel Toed Shoes

Moore Electrical-

(1JIW); Pfizer

Req. Date: 4/29; Start Date: 5/6; 7:00AM - 3:30PM; Indefinite

Required: MI JIW License, MUST drug test within 30 days, Background Check

Moore Electrical- Daybook

(2 JIW);Gun Lake Casino

Req. Date: 4/18/24; Start Date:4/22/24; M-F 6AM-4:30PM, OT for several weeks, subject to change*

Required: MI Journeyman License, MUST Drug Test, Background Check

Bring 2 forms of ID, DL & SS/Birth Cert/Passport

Centennial Electric - (2) Daybook

(2 JIW)

Req. Date: 4/17/24; Start Date: 4/22/24; 7:00AM - 3:00PM;

Gun Lake Casino; Duration: 1 Month

MI JIW License

Centennial Electric#14

(1 JIW)Req. Date: 4/10/24; Start Date: 4/15/24; 7:00AM - 3:00PM;

Gun Lake Casino; Duration: End of Year

MI JIW License

Moore Electrical- Book II

(1JIW); Pfizer - Various

Req. Date: 3/15; Start Date: 3/19; 6:00AM - 2:30PM; Indefinite

Required: MI JIW License, MUST drug test within 30 days, Background Check

Moore Electrical-Daybook

(5 JIW - Increased Call 3/19);Gun Lake Casino

Req. Date: 2/27/24; Start Date: 3/4/24; M-F 6AM-2:30PM, Possible OT; Indefinite

Required: MI Journeyman License, MUST Drug Test, Background Check

Bring 2 forms of ID, DL & SS/Birth Cert/Passport

Gurtz Electric-

(1 JIW), Pfizer MAPS

Start4/5/247AM-3:30PM, M-F

Michigan State Journey License and Onsite Drug Testing required, OSHA 10, must work full schedule

Moore Electrical - Bk I #10, #12

(2 JIW); Zoetis B248 - Various

Updated: 3/21; Start Date: 3/21;(5x10's)6:00AM - 4:30PM Mon - Fri; Indefinite

MI JIW License, MUST drug test within 60 days, Background Check

Moore Electric- Daybook

(2 JIW),Zoetis PortageSite

Start Date: 2/15/24; (Four 10s) 6:00AM - 4:30PM; Indefinite

MI State License, Background Check; Drug Test

Moore Electrical- Daybook

(1JIW);Gun Lake Casino

Start Date: 2/14/24; M-F 6AM-2:30PM; Indefinite

Required: MI State J-man License, Drug Test, Background Check

Bring 2 forms of ID, DL & SS/Birth Cert/Passport

Champion Specialty Services- Daybook

Please Note: This is a National Labor Agreement Contract.Clickherefor details

Requested 2/5/24, (2 JIW), Palisades Nuclear Facility

Report: 2/7/24, 6:30AM to 5:00PM, M-T 10 hours, Friday OT when necessary,

Background check up to 2 weeks before start

Contractor Drug Testing, Background Check, Masks Required, NMAP

Moore Electric- Canceled Call

(2 JIW), Pfizer

Start Date: 1/25/2024; 6:00AM - 2:30PM; Indefinite

MI State License, Background Check; Drug Test

Moore Electrical-#17, #2, & (2) Daybook

(4 JIW);Gun Lake Casino

Start Date: 1/9/24; M-F 6AM-2:30PM; Indefinite

Required: MI State J-man License, Drug Test, Background Check

Bring 2 forms of ID, DL & SS/Birth Cert/Passport

ICC Electric -#9, CE

(2 JIW) - FlavorSum Kalamazoo

Start Date: 1/25/24, (Four 10's) 7AM

Applicant must have 2 forms of ID

Flemington Instrumentation- (1) Book 2

(cancelled); Pfizer MAPS; Portage

Start Date: 1/15;4-6 Week Call

58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays; OT not guaranteed

Onsite Drug Test, Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.

Please bring Driver's License, SS Card, and OSHA Card.

Moore Electric- Daybook

(2 JIW),Zoetis PortageSite,

Start Date: 1/8/2024; (Four 10s) 6:00AM - 4:30PM; Indefinite

MI State License, Background Check; Drug Test

Hi-Tech Electric-

(1) CE, Various Locations

Start Date: 1/25/24, 7AM to 3:30PM, Indefinite

Michigan State License Required, MUST drug test,Driver's License, SS Card

Hi-Tech Electric- # 17, (3) Daybook, (1) Book II

(5 JIW),Pfizer Portage Site

Start: 9/14/23, 7AM - 3:30PM,Indefinite

Moore Electric- 17

(1)JIW,Zoetis DowntownSite,

Start Date: 1/8/2024; 7:00AM - 3:30PM; Indefinite

MI State License, Background Check; Drug Test

Champion Specialty Services- Daybook

Please Note: This is a National Labor Agreement Contract.Clickherefor details

Requested 11/13/23, (filled) JIW, Palisades Nuclear Facility

Start 1/2/23*, 6:30AM, M-T 10 hours, Friday OT when necessary

Contractor Drug Testing, Background Check, Masks Required

Riverway Electric- Bk I #24

Requested Date: 12/21/2023 - 1 JIW; Fresh Thyme on Westnedge in Portage

Start Date: 1/15/2024; 10:00PM-6:30AM; 4-5 Nights

Converting Fluorescent Lighting to LEDS

Michigan State JIW License Required; Must bring ID & SS card for new hire paperwork.

KEI Electric -Daybook, (2) Book II

(5 filled)JIW,Multiple Locations

Start Date: 10/9/23,7:00AM - 3:30PM; Indefinite

SS and Drivers Licensed Required

Moore Electrical-

(1) CE,Shop

Start Date:12/4/2023; 1st Shift; Indefinite

MI State License, Background Check; Drug Test

Martell Electric - #22

Requested 10/23/23, (1) JIW, Woods Lake Elementary

Start 10/24/23; 6AM to 2:30PM, M-F

Current MUST Drug Test required, ID/SS# required

KEI ECM

(1) VDV Tech

Start Date: 10/11/2023; 7:00AM - 3:30PM; Indefinite

Gurtz Electric-(1) Book II, (1) Daybook , Closed

(4 of5 filled)JIW, Pfizer MAPS

Start 7/11/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM

Michigan State Journey License and Onsite Drug Testing required, OSHA 10, must work full schedule

Flemington Instrumentation- (1,2, 2 x Day Book)

(4of 4 filled) JIW; Pfizer MAPS; Portage

Start Date: 10/16; 6-Week Call

58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays, OT not guaranteed

Onsite Drug Test, Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.

Michigan State License Required

Moore Electrical: Closed

(2)JIW; Gun Lake Casino

Start Date: 10/10/23; 7:00am; Indefinite

Required: MI State JIW License, Drug Test, Background Check

Bring 2 forms of ID, DL & SS/Birth Cert/Passport

Moore Electrical- Closed

(2) JIW, Pfizer Portage Site,

Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite

MI State License, Background Check; Drug Test

Moore Electrical- Closed

(1 of 3 filled)JIW,Zoetis DowntownSite,

Start Date: 9/18/2023; 7:00AM - 3:30PM; Indefinite

MI State License, Background Check; Drug Test

Moore Electrical- Daybook, #18

(2 of 2 filled JIW),Gun Lake Casino; New Construction

Start Date: 9/26/2023; 6:00AM - 2:30PM; Indefinite

MI State License, Background Check; Drug Test

Moore Electrical- #23,2x Book II

(3 of 3 JIW Filled),Gun Lake Casino; New Construction

Start Date: 9/18/2023; 6:00AM - 2:30PM; Indefinite

MI State License, Background Check; Drug Test

Shaum Electric - Day Book , Closed

(1 of 2 JIW Filled) JIW; Tek Modo; Three Rivers

Start: 6/20/2023; 7:00AM - 3:30PM M-F; 5-6 Months

Required: Michigan Journeyman Electrical License

Moore Electrical(Daybook) Closed

(2 of 3 filled) JIW, Various Location

Start Date: 8/21/2023; 7:00AM - 3:30PM; Indefinite

MI State License, Background Check; MUST Drug Test required

Flemington Instrumentation- #18, daybook x 3

(4 of 4 filled) JIW; Pfizer MAPS; Portage

Start Date: 7/24/23; 6-Month Call

58 hrs/week, 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays

MUST be willing to work all hours; Contractor drug test required.

Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.

Michigan State License Required

Gurtz Electric-(5) Book 2's

(5 of 5 Filled) JIW, Pfizer MAPS

Start 6/19/23 @6:30AM, Shift Hours M-F 7AM-5:30PM + Sat. 7AM-3:30PM

Michigan State Journey License and Onsite Drug Testing required

Hi-Tech Electric- Daybook

(1) JIW, Service Truck, Various Locations

Start Date: 8/7/23, 7AM to 3:30PM, Indefinite

Michigan State License Required, MUST drug test, Background Check, and Personal ID

Moore Electrical (Daybook x 2)

(2) JIW, Gun Lake Casino; New Construction

Start Date: 8/15/2023; 6:00AM - 2:30PM; Indefinite

MI State License, Background Check; Drug Test

Block Electric- #22

(1) JIW, Meijer in Plainwell

Start Date: 8/7/23, (2nd Shift) 5:00PM Start, 4/10s M-T, 8 week duration

2 forms of ID and Information for Direct Deposit required

Nitro Electric - #21

(1 of 2 filled) JIW, Vicksburg High School

Start Date: 6/12/23, 7AM-3:30PM

Michigan State Journeyman License, Background Check, Personal ID required

Hi-Tech Electric - Cancelled

(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers

Start Date: 6/6/2023;6:00AM - 2:00PM

Michigan State JIW License,Personal ID

Hi-Tech Electric - Cancelled

(0 of 1 Filled) JIW, American Axle, Maintenance, Three Rivers

Start Date: 6/6/2023; 2:00PM - 10:00PM

Michigan State JIW License, Personal ID

Hi-Tech Electric _Daybook

(Filled) JIW, AAM Maintenance - Three Rivers

Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call

MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.

Martell Electric- #23

(1) JIW, Loy Norrix HS

Start Date: 7/21/23, 50 hrs, 6AM - 4:30PM M-F, Summer

Current MUST Drug Test Required

Martell Electric-

(2 of 2 filled) JIW, Loy Norrix HS

Start Date: 7/27/23, 50 hrs, 6AM - 4:30PM M-F, (Edit)Short Call 2-weeks

Current MUST Drug Test Required

Martell Electric:

(2 of 2 filled) JIW,Gull Lake Middle School

Start Date: 7/25/23, 50 hrs, 6AM - 4:30PM M-F,Summer

Current MUST Drug Test Required

Hi-Tech Electric- Daybook

(1) JIW, Service Truck, Various Locations

Start Date: 7/17/23, 7AM to 3:30PM, Indefinite

Michigan State License Required, MUST drug test, Background Check, and Personal ID

Newkirk Electric:(Cancelled)

(0 of 1 Filled) JIW, Covert Generating Plant

Start 6/14/23, (4) 10's, 7AM to 5:30PM Mon - Thurs; 2 Months

MI State Journeyman License, current MUST Drug Test, and Background Check Required

Flemington Instrumentation(3x Day Book)

(0 of 3 open) JIW; Pfizer MAPS; Portage

Start Date: 6/27/2023; 7:00am - 5:30pm M-F & 7:00am - 3:30pm Saturdays

MUST be willing to work all hours; Contractor drug test required.

Nonsmoking site, No smoking in parking lots; OSHA 10 or 30.

Martell Electric: Daybook

(1) JIW,Gull Lake Middle School

Start Date: 7/17/23, 6AM - 4:30PM M-F,Summer

Current MUST Drug Test Required

Moore Electrical-#25, #26, (2) daybook

(0 of 4 open) JIW, Zoetis

Start 7/17/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, Drug Test, 2 forms of ID required

Block Electric#19

(1) JIW, Meijer in Plainwell

Start Date: 7/10/23, (2nd Shift) 6:00PM Start, 4/10s

2 forms of ID and Information for Direct Deposit required

Martell Electric

(1) JIW, Loy Norrix HS

Start Date: 6/27/26, 6AM - 4:30PM M-F, 2 month duration

Current MUST Drug Test Required

KEI Electric: #21, Day Book

(0 of 2 open) JIW, Graphic Packaging Inc

Start 6/15/23, 7AM-3:30PM, Mon - Friday

Michigan State Journeyman License required.

Martell Electric- #4

(1)Service Truck Driver

Start Date: 7/17/23, 7:00-3:30PM M-F,Indefinite

Current MUST Drug Test Required, Michigan State Electrical License, Driver's License

Hi-Tech Electric - Daybook

(1) JIW, Service Truck

Start Date: 6/12/23, 7AM to 3:30PM, Indefinite

Michigan State License Required, MUST drug test, Background Check, and Personal ID

Climax Construction- Book II

(1) JIW; Various Locations; Residential Solar Installations

Start Date: ASAP; 8-12 Hour Shifts, Starting at 6:00AM (M-F &OccasionalSaturdays)

Michigan State License Required

Martell Electric - #2

(1) JIW; KPS Wood Lake Elementary - Commercial Electrical

Start Date: 6/12/23; 7:00 AM- 3:30 PM; 3-4 Month Call

MUST Drug Test (Within 30 Days)

Martell Electric

(1) JIW; Gull Lake Middle School - Lighting & Lighting Controls

Start Date: 6/12/2023; 7:00 AM - 3:30 PM; Approximately 3 Month Call

MUST Drug Test (Within 30 Days)

Hi-Tech Electric - Call Canceled

(0 of 1 Filled) JIW, AAM Maintenance - Three Rivers

Start: 6/6/2023 @ 10:00PM (10PM - 6AM); Indefinite Call

MI State JIW License, Current MUST Drug Test; Experience in troubleshooting industrial equipment is a plus.

Moore Electrical - #27

(1) JIW, Shop - Various Locations

Start 6/7/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, Drug Test, 2 forms of ID required

Moore Electrical - #28

(1) JIW, Shop - Various Locations

Start 6/7/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, Drug Test, 2 forms of ID required.

ShaumElectric- #1, Day Book

(2) JIW, Tek Modo, Three Rivers

Start: 6/6/23 @ 7:00AM;4-6 months

Michigan State License Required

Flemington Instrument(5/25) :#1, #11

2 JIW, Pfizer, Portage

Starts Wednesday, May31st at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays

MUST be willing to work all hours; Contractor drug test required.

Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.

Moore Electric- #7, #29, #11

(3) JIW, Shop - Various Locations

Start 5/30/23, 7AM to 3:30PM, Indefinite

MI State License, Background Check, MUST Drug Test, 2 forms of ID required

Hi-Tech Electric-Call Cancelled

(1) JIW,AAM Maintenance

Start: 5/24/23,10PM - 6AM,3Night Call

Michigan State License Required, MUST drug test, and Personal ID

Hi-Tech Electric-Call Cancelled

(1) JIW,AAM Maintenance

Start: 5/24/23,10PM - 6AM, 8 night Call through June 8th

Michigan State License Required, MUST drug test, and Personal ID

Hi-Tech Electric-#19

(1) JIW,Various Locations - Service Maintenance

Start: 5/23/23, 6:00AM-2:30PM Shift

Michigan State License Required, MUST drug test, Background Check, and Personal ID

Gen3 Electric - #29, #30

(2) JIW's, Pfizer MAPS

Start 5/19/23, 7am-330PM

On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift

Hi-Tech Electric-

(1) CE,Various Locations

Start: 5/22/23, 7:00AM-3:30PM Shift

Michigan State License Required

Moore Electrical- #5

(1) JIW - Justice Facility

Start:May 22nd; 40 Hour Call; Indefinite

Background Check, Drug Testing,MI Journeyman License Required

Flemington Instrument: (2) Bk IIs

(2) JIW, Pfizer, Portage

Starts Tuesday, May 16th at 6:30AM; 7AM - 5:30 M-F; 7AM - 3:30PM Saturdays

MUST be willing to work all hours; Contractor drug test required.

Nonsmoking site, 3 story building; lots of walking up and down stairs; OSHA 10 or 30 card needed.

Hi-Tech Electric - #27

(1) JIW, American Axle, Three Rivers

Start: Monday, May 15th; 2nd Shift: 2PM-10:30PM (12 1/2% Shift Premium)

Michigan State License Required

Flemington Instrument-#2 & #25

(2) JIW, Pfizer, Portage

Start: 5/08/2023 @ 6:30AM; 5-10's; Duration: 6 Months

On-site Contractor Drug Testing, OSHA 10/30, NO SMOKING During Shift

Moore Electrical - Day Book

(1) VDV Tech, Various Locations

Start: April 24th; 40 Hour Call; Indefinite

Background Check & Drug Testing Required

Climax Solar - Bk 2

() JIW, Various Locations

Start: Monday April 24th; M-F 6AM-2:30PM, OT Available; Indefinite Call

MI State JIW License Required; Residential Experience Preferred

Flemington Instrument -#22

(1) JIW, Pfizer, Portage

Start: 4/19/2023 @ 6:30AM; 5-10's; Duration: 3 Months

On-site Contractor Drug Testing

Shaum Electric - #13 & CE

(Filled) JIW, Tek Modo, Three Rivers

Start: 4/13/2023 @ 7:00AM; Duration TBD

Michigan State License Required

Hi-Tech Electric- #24 & (2) Book 2's

(3) JIW, Pfizer Portage Facility

Start: Wed. 4/12/23, 7AM - 3:30PM, One Month Call

Required: MI State License, MUST Drug Test in last 30 days, Background Check, and

Covid Vaccination required.

Moore Electric -

(1) CE - Shop

Start - Tuesday April 4th, 7:00AM Start

MUST Drug Test, Background Check, State License, Valid Drivers License

Shaum Electric - #13, #21, (1) Bk II

(3) JIW, Tek Modo, Three Rivers

Start 4/3/2023 @ 7:00AM; Duration 1+ Month Call

Michigan State JIW License Required

FE Moran - #9 & (2) Book 2's

(3) JIW, Pfizer Portage Site

Start 3/27/2023 @ 6AM, Schedule - 4-10's & OT Possible, subject to change - 3-4 Month Call

Onsite Drug Testing

Flemington Instrument- #1 & #7

(2) JIW, Pfizer Portage Site

Start 3/27/23 @ 7AM, Schedule - 5-10's & 8 on Sat. - 5 Month Call

Onsite Drug Testing & Driver's License Required, Must be willing to work OT

Moore Electric -

(1) CE - Shop

Start - Wednesday March 22, 2023

Hi-Tech Electric

(2) CEs, Outside, Inside, Commerical, Residential, Service Work, Various Location

Start: Monday, March 30, 2023; Indefinite Call

MI State License, Background Check, Contractor Drug Test

FE Moran- (2) Book 2's

(2) JIW, Pfizer MAPS Project, Fire Alarm

Start 3/1/23, 6:00AM Start, Four Tens-Schedule for 4-5 months, Possible OT

Michigan State Journey License, On-site Drug Testing, 2 forms of ID required

Hi-Tech Electric - #18

(1) JIW, Pfizer Portage Facility

Start: Monday2/20/23, 7AM - 3:30PM, One Month Call

Required: MI State License, MUST Drug Test in last 30 days, Background Check, and

Covid Vaccination required.

Hi-Tech Electric - Filled by CE

(1) CE, Commercial Work, Various Locations

Start: Monday, 2/20/2023, Indefinite Call

Required: MI State License, MUST Drug Test, Background Check, COVID-19 Vaccination

Climax Solar - #19 & Book 2

(2) JIW, Residential Solar Work, VariousLocations

Start: 2/13/23 @ 6:00AM M-F, Indefinite Call

MI State License Required, Long Hours, Shift Length Varies

Flemington Instrument(#8)

(1) JIW, Pfizer Portage Site

Start:2/14/23 @ 6:45AM, 6 Month Call, OT Available

Michigan State Journeyman Licenses, 2 forms of ID, Online Orientation to be completed Friday by 3PM for Tuesday Start

Flemington Instrument - (#1 & #17)

(2) JIW, Pfizer Portage Site

Start:2/6/23 @ 6:45AM, 5-6 Month Call, OT Available

Michigan State Journeyman Licenses & 2 forms of ID

Schwartz Electric - (#5)

(1) JIW,Heartland RV (new construction), Sturgis MI

Start 1/30/23, 7AM to 3:30PM, M-F, Indefinite

Michigan State Journeyman License & 2 forms of ID Required

FE Moran(Book 1 - #1, #3)

(2) JIW, Pfizer MAPS Project, Fire Alarm

Start 1/30/23 *corrected*, 6:30AM Start, Four Tens-Schedule for 4-5 months

Michigan State Journey License, On-site Drug Testing, 2 forms of ID required

Moore Electric- Book 1 (#1 & #27), (1) Book 2

(0 of 3 open) JIW, Pfizer Shutdown Work, Portage

Start 1/25/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23

MI State License, Background Check, MUST Drug Test within 30 days before reporting to work,

COVID-19 Vaccination Required

Paperwork & orientation must be completed by noon Friday to report Monday

Moore ElectricFilled Book II

(2) JIW, Pfizer Portage Site

Start 1/23/23, 7AM Start, 10 hours Monday thru Friday, 8 Hours Sat.

MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,

Paperwork & orientation must be completed by noon Friday to report Monday

Hi-Tech Electric

(1) CE, Various Locations

Start 1/23/23, 7AM to 3:30PM

MI State License Required

Moore Electric - #21, #23, (2) Book 2

(4 of 4 filled) JIW, Pfizer Shutdown Work, Portage

Start 1/16/23, 7AM to 3:30PM, OT during 3-week shutdown beginning 2/22/23

MI State License, MUST Drug Test within 30 days before reporting to work, COVID-19 Vaccination,

Paperwork & orientation must be completed by noon Friday to report Monday

Nitro Electric - Book 2

(1) JIW, Aldis, Sturgis Michigan

Start 1/9/23, 7AM to 3:30PM, 2 weeks

Michigan State Electrical License Required

KEI Electric - 2 Book 1

(2) JIW, Various Locations

Start 1/5/23, 40 hrs 7AM-3:30, Indefinite

Current MUST Drug Test required

Schwartz Electric

(1) JIW, Heartland RV, Sturgis MI

Start 12/27/22, 7AM to 3:30PM, Indefinite

Michigan State License and 2 forms of ID Required

Climax Construction

(1)CE, Residential Solar, various locations

Start 12/23/22, 6AM Start, Indefinite Call

Current MUST Drug Test and Background Check Required

Moore Electric - filled by #38, 36, & (2 Book 2's)

(1 of 4 open) JIW, Pfizer Portage Site

Start 12/19/22, Indefinite, 7AM to 3:30 PM 40 hours-a-week

Full Covid-19 Vaccination Required,Must Drug Test last 30 days before reporting to site, 2-3 day background check before reporting to site, Masks required on site

Climax Construction

(1)CE, Residential Solar, various locations

Start 12/13/22, 6AM Start, Indefinite Call

Current MUST Drug Test and Background Check Required

Hi-Tech Electric

(1) CE, Service Truck

Start 12/12/22, 1st Shift

Michigan State License Required

IBID County ElectricBook I #8, #22, #34, #39, #40 Book II #8

(6) JIW, Welch Foods Inc, Lawton MI

Start 11/22/22, 6AM to 4:30PM, 7 Days a Week for 2 Months

Michigan State License and Masks are required on site

IBID County Electric - Filled by (4) Book 2's (daybook)

(0 of 4 open) JIW, Welch Foods Inc, Lawton MI

Start 11/16/22, 6AM to 4:30PM, 7 Days a Week for 2 Months

Michigan State License and Masks are required on site

Shaum Electric - Filled by Book I #36 & day book, (3) Book 2,

(0 of 5 Open) JIW Tekmodo Moldings, Three Rivers

Start 11/07/22, 7AM to 3:30PM, 5 Month Call

Michigan State Journey License Required

Moore Electrical(Filled by # 1, #39, 2 Book 2's)

(4) JIW, Pfizer

Starting Monday, October 31st; 7:00am-3:30pm

Required: MUST Drug Test (within 60 days), MI State License, Background Check (2-3 days),COVID Vaccination

Climax Solar -

CE, Commercial/Residential Solar Work

Start 9/27 at 6:00am with Regular OT

Michigan State License Required.

IBID County Electric-

(1) CE, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment

Start November 7th; Duration 2-3 Months

4 x 10's, OT Fridays & Saturdays, Working some Sundays, 6 AM Start

Required: MI State License, Masks, Safety Toed Shoes & Glasses

IBID County Electric - Filled by #3, #4 & Book 2

(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment

Start November 2nd; Duration 2-3 Months

4 x 10's, OT Fridays & Saturdays, Working some Sundays

Required: MI State License, Masks, Safety Toed Shoes & Glasses

IBID County Electric - Filled by #39 & 40, Book 2

(3) JIW, Welch's, Paw Paw; Existing Food Processing Facility, New Equipment

Start October 26th; Duration 2-3 Months

4 x 10's (Mon-Thurs); OT on Fri, Sat, and Some Sundays

Required: MI State License, Masks, Safety Toed Shoes & Safety Glasses

J-Ranck - Filled by #10

(1) JIW, Various Location, Pump Stations

Start 10/24/22, 7AM-5:30PM, 4-10 Sched.

2 Forms of ID Required

Shaum Electric - Filled by Book I # 10 & 31

(2) JIW Tekmodo Moldings, Three Rivers

Start 10/17/22, 7AM to 3:30PM, 6 Month Call

Michigan State Journey License Required

Climax Solar - Filled by #42

(1) JIW, Residential/Service Solar Work

Start 10/10/22, 6AM start with regular OT

Michigan State License Required

Moore Electric

(1) CE3, Zoetis Farms, Kalamazoo

Start 10/5/22, 7AM to 3:30PM, Indefinite

Must Drug Test and Background Check require

IBID County Electric - Filled by Book 1 #1

(1) JIW, Welch's, Paw Paw

4x10's with OT on Friday & Saturday; 2-3 Month Call.

Michigan state license, safety glasses, hardhat, steel toed shoes, and masks are all required.

Lakeland Electrical - (2)Book 2 #36 & (1) Book 1 Daybook

(0of 3 Open) JIW, Pfizer MAPS, Portage

Start Monday, October 3rd. Long Call. 7:00AM-3:30PM M-F; OT When Necessary

Onsite & Random drug testing; Background Check Required

No COVID vaccination or mask mandate required.

Ibid County Electric - (Filled by Book 2)

(1) JIW, Welch's in Lawton, MI

Start 9/29/22, hours 6AM to 4:30 PM, 4/10's with OT on Friday and Saturday

MI State Journeyman Electrical License, Masks, and PPE required.

Moore Electric (Book I #13, Book I Day Book, Book II - Day Book x 2)

(0 of 4 open) JIW, Zoetis (Various Locales),

Start 9/29/22, OVERTIME; 6AM to 3:30 PM M-F

MUST Drug test within 30 days of Hire, Background Check required

Moore Electric- Filled by#42

(2) JIW, Pfizer Portage Site

Start 9/28/22, 7 AM to 3:30 PM, M-F

Current Must drug test (within 30 days of hire), Background Check, Covid-19 Vaccination,

and Masks are required

Lakeland Electric (Book I #43, #43)

(2) JIW, Pfizer Maps, Kalamazoo

Start Monday, September 26, Long Call, 7:00AM to 3:30PM, OT When Necessary

Onsite& Random Drug Testing, Background Check Required.

No COVID Vaccines or Masks Needed

Moore Electrical - Filled by Book 1 #39

(1) JIW, Zoetis, Kalamazoo

Start 9/12, Long Call, 7:00AM to 3:30PM

Current MUST Drug Test, Background Check, and MI State License Required

Schwartz Electric -Filled by Book1 #44, #42

(2) JIW, Sturgis Michigan, New Industrial Build

Start 9/9, Long Call, 7AM to 3:30PM

Current Must Drug Test and MI State Journeyman License Required

Lakeland Electric - Filled by (2) Book 1 #32 & #44 and (2) Book 2

(4) JIW, Pfizer MAPS Project, New build pharmaceutical facility

Start, Long Call 6+ Months, 7:00AM to 3:30PM, OT as needed

On-Site Drug Testing Required, may be subject to random testing. Background Check required.

No Covid-19 Vaccine requirement.

KEI Electric - Filled by (3) Book 1: #40, #47, #41 & (4) Book 2

(7) JIW, Day Shift for Graphic Packaging Annual Shutdown

Report 9/9 for paperwork. Shutdown is 4 days, 9/12 to 9/15.

First Shift, 12 hours, 6AM-6PM

KEI Electric - Filled by (1) Book 1: #39 & (4) Book 2's

(5) JIW, Night Shift for Graphic Packaging Annual Shutdown

Report 9/9 for paperwork. Shutdown is 3 nights minimum, 9/12 to 9/14.

Night Shift, 12 hour, 6PM-6AM, All hours paid @ OT (1.5x)

Lakeland Electric

No JIW Call at this time, previous call due to request error

Brite Electric

(1) JIW, Drive and Shine (S Westnedge), Kalamazoo

Start 8/31/22, 7AM to 3:30 PM, 8 to 12 weeks

Michigan State Journeyman License is required

Hi Tech Electric

(1) CE, Commercial and Industrial

Start 8/25/2022, Indefinite

Climax Solar

(1) CE for Residential Solar Work

Start 8/29/22, 6AM

IBID County Electric

(1) JIW, Welch's Foods (Lawton, MI)

Start, 8/23, 4-10s, Mon-Thurs, likely Friday (OT) as well. 6:00AM to 4:30PM

MI State License Required

Lakeland Electric

(2) JIW, Pfizer MAPS Project

Start 8/23/22, 12-24 month Call, 7:00AM to 3:30PM

On-Site Drug Testing Required, may be subject to random testing. Background Check required. (Edit) No Covid-19 Vaccine requirement.

Climax Solar

(1) CE, Residential Solar Service

Start: 8/15/22

MI State License Required

Shaum Electric

(1) JIW, New Construction, Three Rivers, MI

Start:8/10/22, Duration: 6-8 Months, M-F 7AM-3:30PM

MI State License, Lift certification Required, 2-forms of ID required for Hiring Papers

Moore Electric

(2) JIW, Pfizer-Portage - (1) Cancelled

Start 08/9/22, Indefinite call 7:00AM to 3:30PM

Drug Test within last 30 Days, MI Lic. Journeyman, Background Check, Cov-19 Vaccine, Masks

Required onsite

Martell Electric

(1) JIW, Gull Lake Middle School

Start 8/8, Short Call 1-2 weeks

4-10 Schedule

Drug Test Required within 30 days of start

Climax Solar

(1) JIW, Residential Solar Work

Start 8/3,Long Term/Indefinite Call

6:00AM to 5:00PM, Regularly available OT. Some Mondays Off

MI Journeyman License Required

Moore Electrical

(1) JIW, Pfizer - Misc.

Report to Moore Shop on 8/3/22

40+ hrs - Occasional OT as needed

Drug Test within last 30 days, Background Check, Covid-19 Vaccine, and Masks required

IBEW Local 131 Job Information Page (2024)

References

Top Articles
Latest Posts
Article information

Author: Manual Maggio

Last Updated:

Views: 6527

Rating: 4.9 / 5 (49 voted)

Reviews: 88% of readers found this page helpful

Author information

Name: Manual Maggio

Birthday: 1998-01-20

Address: 359 Kelvin Stream, Lake Eldonview, MT 33517-1242

Phone: +577037762465

Job: Product Hospitality Supervisor

Hobby: Gardening, Web surfing, Video gaming, Amateur radio, Flag Football, Reading, Table tennis

Introduction: My name is Manual Maggio, I am a thankful, tender, adventurous, delightful, fantastic, proud, graceful person who loves writing and wants to share my knowledge and understanding with you.